In the morning a group started to lay out where each tripod would stand - marking the centre of the tripod with a stake. At the same time a group worked on constructing the first test tripod. From the first test tripod, we shifted the angle of the hole and lengthened each post. Once we figured out where each post should sit on the ground, we were able to mark out all 16 tripods onto the site.
No comments:
Post a Comment